J Med Phys Close
 

Table 2: Revised quality assurance/quality control schedule for medical electron linear accelerator along with recommended tolerance, test frequency, and personnel required

Table 2: Revised quality assurance/quality control schedule for medical electron linear accelerator along with recommended tolerance, test frequency, and personnel required